TECH2200 IT Project Management Assignment Help

TECH2200 Assignment help
Assessment 2 Information:
TECH2200.1

Your Task

Your second assessment in this subject requires you to create a detailed Project Management Plan (PMP) based on the Business Case you have created in the first assessment. The PMP has detailed management plans for scope, time, cost, team, and communication, plus a thorough risk analysis by using the Risk Matrix. which provides a comprehensive guide and recommendations for the project execution, control, and monitoring after it is approved.

Assessment Description

A Project Management Plan is a project management document that outlines the details of what, how, when and what if of a project’s execution. It is presented in a well-structured written document to all key stakeholders so that they can gain a comprehensive understanding of the plan to execute the project. A PMP is essential to project success, and it causes failure if we don’t get it right in the first place. The Risk Analysis using the Risk Matrix is based on two factors: the likelihood that the risk event will occur, and the potential impact that the risk event will have on the project. In other words, it's a useful tool that helps you visualise and understand the risk so that we can make good recommendations to the project. A thorough understanding of how to write a Project Management Plan and Risk Analysis must be demonstrated in this assessment.

The learning outcomes you will demonstrate in performing this assessment includes:

TECH2200.2

Assessment Instructions

  • Based on your approved business case, you are required to create a Project Management Plan to cover the following:
  • 1. Executive Summary
  • a) Provide a high-level introduction of what your report will cover about the Project Management Plan

    b) Include the purpose of the Project Management Plan

  • 2. Project Goals
  • a) Include a summary of what the project will achieve (at least 4)

  • 3. Scope Statement
  • a) Expand the 2-levels WBS in assessment 1 into a 4-levels WBS (refer to below example) • The WBS will outline what are in-scope

    a) b) Out of scope (at least 4)

    a)• This section details the work which are not included in this project so they should not be performed )

    TECH2200.3
  • 4. Time Management
  • a) Develop a Gantt Chart using MS Excel, GanttProject, or ProjectLibre based on the WBS

    a) • Demonstration will be covered in Week 8 (Project Management Tools)

  • 5. Cost Management / Budget
  • a) Develop a budget plan based on the WBS (Cover all level 4 WBS items)

    a)• Hint: create a table to list items based on WBS and calculate the estimated cost

    TECH2200.4
  • 6. Team Management
  • a) Develop a team / recourse plan (at least 6 team members)

    a)• Hint: create a table to outline: Name, role, skills

  • 7. Communications Plan
  • a)a)a) Develop a communications plan by using communication matrix (at least 6)

    TECH2200.5
  • 8. Risk Analysis
  • a) Analyse the risk by using Risk Matrix to cover:

    • The major risks (at least 6)

    • Their likelihood (rate 1 – 5), the consequence on the project (rate 1 – 5)

    • The cause of the risk

    • The response that will be undertaken

    • The resources that will be used in the response

    • The owner of the risk is in terms of monitoring, acting, and reporting

    • b) Provide at least 3 recommendations based on the risk analysis

    TECH2200.6

    Submission Instructions

    • Name your report document “Assessment 2_Report_[Student ID]” • You do NOT need to submit the Gantt Chart (Excel / GanttProject / ProjectLibre) file, instead, you need to include the screenshot of your Gantt Chart into the report.

    • Save it as a Word or PDF document format

    • Submit on MyKB

    Assessment Marking Guide
    TECH2200.7 TECH2200.8
    Important Study Information

    Academic Integrity and Conduct Policy

    KBS values academic integrity. All students must understand the meaning and consequences of cheating, plagiarism and other academic offences under the Academic Integrity and Conduct Policy.

    Please read the policy to learn the answers to these questions:

    • What is academic integrity and misconduct?

    • What are the penalties for academic misconduct?

    • How can I appeal my grade?

    Late submission of assignments (within the Assessment Policy)
    TECH2200.9
    Length Limits for Assessment

    Penalties may be applied for assessment submissions that exceed prescribed

    limits. Study Assistance

    Students may seek study assistance from their local Academic Learning Advisor or refer to the resources on the MyKBS Academic Success Centre page.

    Submission Requirements

    All assessments including draft copies must be written and submitted in English. The use of translation tools is not permitted.

    Submission Requirements
    TECH2200.10 TECH2200.11

    Have Any Questions?

    Find out more about our tutoring services, book a tutor or ask any questions you might have.

    Contact Assignment Help